Case Study
Collaborative Ground Investigation & Earthworks Design for Infrastructure Development on St Helena
Challenge: Delivering a Geotechnical Framework for a Remote Island Construction Project GeoEnviro Solutions Ltd (GES) provided ground investigation support and worked in collaboration with engineering teams on St Helena to develop a geotechnical framework and...
Comprehensive Rail Embankment Investigation Along Active Freight Branch Line
Challenge: Rail Embankment Investigation for Stability and Monitoring GeoEnviro Solutions Ltd (GES) was commissioned to carry out a detailed rail embankment investigation along an active freight branch line. The objective was to assess slope stability and monitor...
Advanced Site Investigation for Retaining Wall Design and Slope Stability at Coombe Farm
Challenge: Complex Geological Features and Retaining Wall Design GeoEnviro Solutions Ltd was engaged to conduct a detailed geotechnical site investigation for the residential redevelopment of the former Coombe Farm in Saltdean, near Brighton. The site presented...
Precision Ground Investigation at Malvern Rail Link
Challenge: Restricted Access and Working Along Active Railway Tracks GeoEnviro Solutions Ltd (GES) was tasked with performing a detailed ground investigation along the railway embankment southbound from Malvern Link Railway Station. Initially, the project scope...
Site Investigation at National Grid High Voltage Substations
Challenge: Restricted Access and Compliance with National Grid StandardsGeoEnviro Solutions Ltd in collaboration with our sister company Borehole Solutions Ltd was tasked with conducting a site investigation at a National Grid high voltage substation. The project was...
Helical Screw Pile Installation for Telecommunications Infrastructure
Challenge: Limited Access and Need for Piled Foundation SolutionsGeoEnviro Solutions Ltd was contracted by a telecommunications infrastructure company to install AB Chance helical screw piles for the installation of phone masts at multiple sites across the UK. While...
Renewable Heating System Installation at Morecambe Bay Academy
Challenge: Inefficient Gas Boilers and the Need for Renewable Energy Morecambe Bay Academy faced a major heating issue when their ageing and inefficient gas boilers failed completely. The school was relying on a temporary boiler system but sought a long-term,...
Comprehensive Site Investigation for Belvoir Ironworks
Challenge: Adverse Weather Conditions and Site Expansion GeoEnviro Solutions Ltd was engaged to conduct a detailed site investigation for the Belvoir Ironworks redevelopment. The project faced several obstacles due to severe winter weather, which left large portions...
Phase I Environmental Desk Study at Temple Newsam Park
Challenge: Complex Land Use History and Environmental Risks GeoEnviro Solutions Ltd was appointed to conduct a Phase I Environmental Site Investigation on behalf of the civil engineering contractor responsible for renovating and expanding existing roads, footpaths,...